Photo Gallery, page 1 |
|||||||
Click
on thumbnails for larger image |
|||||||
Gotta start somewhere! Carson and Ron | Fuselage and wing overview | Air duct and tailwheel mechanism | Vacuum-bagging a new radiator access hatch | ||||
Radiator hatch process- inside view | Sand-blast prepping glue bond areas on fuse skin | Vacuum-bagging bulkhead spacers on fuse skin | Lifting the upper wing assembly onto wing jig | ||||
Aligning mail landing gear | Bonding LG nose ribs | Installing LG hydraulic systems | Prepping lower wing skins for bonding | ||||
Applying
adhesive -- rear spar bonding |
Detail of carefully crowned Hysol | Ready
for lower right wing skin |
Adding lower wing skin | ||||
Careful positioning | Applying
weight to glue bond areas |
Bonding lower left skin | Detail of left LG area | ||||
Trimming a bulkhead over down-draft filter table | Wing
center section, top view |
Preparing to hoist engine | Preparing to hoist engine | ||||
Installing engine on fuselage | Looks good on there | Trimming clearance for exhaust stacks | Fitting cowl, spinner and prop. WOW! | ||||
There's more!
|
|||||||